PERFORMANCE GUIDELINES: 2. FLOOR FRAMING

2.8 Floors Are Springy or Shake

Acceptable Performance/Condition

All structural members including beams and joists must be sized, installed and fastened in accordance with the Building Code.

Even when all structural members are sized, installed and fastened in accordance with the Building Code, some minor movement may occur and is considered normal.

Warranty Coverage

  • 12 months In-Home
  • 15 months Common Property

Claim Response

Floors not meeting the Acceptable Performance/Condition are to be rectified. Where repairs are made, an exact match of colour, finish, grain, sheen or texture may not be possible.

Maintenance Tip

No maintenance tips available